Colorado PJM410 Module 2 Risk Breakdown Structure for a Foodbank

Question # 00651420
Subject: Business
Due on: 12/25/2023
Posted On: 12/24/2023 09:37 PM
Tutorials: 1
Rating:
4.9/5
Question Dot Image

PJM 410 Colorado State University MOD2 Risk Breakdown Structure for a Foodbank Project

OPTION #1: COLLABORATION: RISK BREAKDOWN STRUCTURE FOR A FOOD BANK PROJECT

Identifying and managing project risks are critical tasks for project managers. From a project management perspective, risks must be managed from the start of a project until its completion; therefore, the Risk Breakdown Structure (RBS) is an important tool that project managers use to successfully complete projects. Assume that you are a project manager assigned a project to set up a food bank facility for your local community within a two-month period, starting from today. Develop a risk breakdown structure that identifies sources of project risks. Consider Figure 11-4 below and the tasks that might be associated with this project.

1. Identify the risks in the form of "cause-risk- effect," as described below:

One of the most common risk-identification mistakes is considering things to be risks when they are not. One approach is to treat anything with a probability of greater than 80 percent as a certainty. "Lack of resources" is not a risk, nor is "not enough time to complete the project." If it is known that the length of time required to complete a project is shorter than the time allocated, then this is not a risk—it's a fact. Such facts should be addressed in the project management plan through crashing, fast tracking, re-estimating, removing scope, using other forms of schedule compression, and bringing the situation to management, but not as part of risk management.

"To differentiate risks from facts and to adequately define risks, use the ‘cause-risk- effect' format for naming risks: As a result of (definitive cause), (uncertain event) may occur, which would/could/may lead to (effect). Such definition of risks provides enough information for the team to follow the rest of the project management process. See the following examples of risks in the cause-risk-effect format:

  1. As a result of lack of clear direction for the scope of work for the XYZ component, there could be rework and wasted efforts, which could delay the project completion from two to four weeks.
  2. As a result of the amount of work the customer is trying to accomplish on many projects during this project's completion, a delay in the response to our requests for approvals may occur, which could result in a two-week delay in project completion. Effects could relate to project objectives, project constraints, and risk tolerances." (Mulcahy, 2003, p. 90)

2. Discuss and analyze the importance of each of the four types of risk identified in Figure 11-4 (technical, management, commercial, and external).

3. Create a risk breakdown structure and attach as an appendix (see attached sample and use the blank RBS linked under this assignment in Module 2).

4. Discuss the importance of creating an RBS.

RBS LEVEL 0 RBS LEVEL 1 RBS LEVEL 2
0. ALL SOURCES OFPROJECT RISK 1. TECHNICAL RISK 1.1 Scope definition
1.2 Requirements definition
1.3 Estimates, assumptions, and constraints
1.4 Technical processes
1.5 Technology
1.6 Technical interfaces
Etc.
2. MANAGEMENT RISK 2.1 Project management
2.2 Program/portfolio management
2.3 Operations management
2.4 Organization
2.5 Resourcing
2.6 Communication
Etc.
3. COMMERCIAL RISK 3.1 Contractual terms and conditions
3.2 Internal procurement
3.3 Supplies and vendors
3.4 Subcontracts
3.5 Client/customer stability
3.6 Partnerships and joint ventures
Etc.
4. EXTERNAL RISK 4.1 Legislation
4.2 Exchange rates
4.3 Site/facilities
4.4 Environmental/weather
4.5 Competition
4.6 Regulatory
Etc.

(Source: PMI, 2017, Figure 11-4)

5. Reach out to at least one other student and discuss your findings about project risk management, based on your review of the case study, to gain greater insight into the main considerations in managing projects. Include the name(s) of the other student(s) with whom you collaborated, and specify the value added by your collaboration with your classmate(s) and what new insights you gained. (Your collaborating colleagues do not need to choose the same Critical Thinking option as you do.)

Your well-written paper should meet the following requirements:

  • Be 3-4 pages (900-1200 words) in length, not including the cover page, references page, or appendix. (Remember that the appendix follows the references page.)
  • Be formatted according to the CSU Global Writing Center. (Links to an external site.)
  • Cite a minimum of three sources to support your responses, two of which should be current academic, peer-reviewed, scholarly sources. Note: Current research in this class means the most recent five-year period. Although research older than five years may be used, it will not count toward the assignment requirement. The CSU Global Library is a great place to find these resources. Additionally, in the Module 1 lecture material, you were reminded of what constitutes academic, peer-reviewed, scholarly sources and how to find them in the CSU Global Library.
  • Demonstrate thoughtful consideration of the ideas and concepts that are presented in the course, and provide new thoughts and insights related directly to this topic.

Refer to the Critical Thinking Assignment grading rubric below for more information on assignment expectations and grading.

References

Mulcahy, R. (2003). Risk management: Tricks of the trade for project managers: A course in a book. Minneapolis, MN: RMC Pub.

Project Management Institute. (2017). A guide to the project management body of knowledge: (PMBOK® guide) (6th ed.). Newtown Square, PA, USA: Project Management Institute.

OPTION #2: COLLABORATION: RISK BREAKDOWN STRUCTURE FOR AN INTERNATIONAL TRAINING FACILITY PROJECT

Identifying and managing project risks are critical tasks for project managers. From a project management perspective, risks must be managed from the start of a project until its completion; therefore, a Risk Breakdown Structure (RBS) is an important tool that project managers use to successfully complete projects. Assume that you are a project manager who is to manage a project to set up a training facility in China to teach project management classes. This project is to be completed within a two- month period, starting from today.

1. Identify the risks in the form of "cause-risk-effect," as described below:

One of the most common risk-identification mistakes is considering things to be risks when they are not. One approach is to treat anything with a probability of greater than 80 percent as a certainty. "Lack of resources" is not a risk, nor is "not enough time to complete the project." If it is known that the length of time required to complete a project is shorter than the time allocated, then this is not a risk—it's a fact. Such facts should be addressed in the project management plan through crashing, fast tracking, re-estimating, removing scope, using other forms of schedule compression, and bringing the situation to management, but not as part of risk management.

"To differentiate risks from facts and to adequately define risks, use the ‘cause-risk- effect' format for naming risks: As a result of (definitive cause), (uncertain event) may occur, which would/could/may lead to (effect). Such definition of risks provides enough information for the team to follow the rest of the project management process. See the following examples of risks in the cause-risk-effect format:

  1. As a result of lack of clear direction for the scope of work for the XYZ component, there could be rework and wasted efforts, which could delay the project completion from two to four weeks.
  2. As a result of the amount of work the customer is trying to accomplish on many projects during this project's completion, a delay in the response to our requests for approvals may occur, which could result in a two-week delay in project completion. Effects could relate to project objectives, project constraints, and risk tolerances." (Mulcahy, 2003, p. 90)

2. Discuss and analyze the importance of each of the four types of risk identified in Figure 11-4 (technical, management, commercial, and external).

3. Create a risk breakdown structure and attach as an appendix (see attached sample and use the blank RBS linked under this assignment in Module 2).

4. Discuss the importance of creating an RBS.

RBS LEVEL 0 RBS LEVEL 1 RBS LEVEL 2
0. ALL SOURCES OFPROJECT RISK 1. TECHNICAL RISK 1.1 Scope definition
1.2 Requirements definition
1.3 Estimates, assumptions, and constraints
1.4 Technical processes
1.5 Technology
1.6 Technical interfaces
Etc.
2. MANAGEMENT RISK 2.1 Project management
2.2 Program/portfolio management
2.3 Operations management
2.4 Organization
2.5 Resourcing
2.6 Communication
Etc.
3. COMMERCIAL RISK 3.1 Contractual terms and conditions
3.2 Internal procurement
3.3 Supplies and vendors
3.4 Subcontracts
3.5 Client/customer stability
3.6 Partnerships and joint ventures
Etc.
4. EXTERNAL RISK 4.1 Legislation
4.2 Exchange rates
4.3 Site/facilities
4.4 Environmental/weather
4.5 Competition
4.6 Regulatory
Etc.

(Source: PMBOK, 2017, Figure 11-4)

5. Reach out to at least one other student and discuss your findings about project risk management, based on your review of the case study, to gain greater insight into the main considerations in managing projects. Include the name(s) of the other student(s) with whom you collaborated, and specify the value added by your collaboration with your classmate(s) and what new insights you gained. (Your collaborating colleague(s) do not need to choose the same Critical Thinking option as you do.)

Your well-written paper should meet the following requirements:

  • Be 3-4 pages (900-1200 words) in length, not including the cover page, references page, or appendix. (Remember that the appendix follows the references page.)
  • Be formatted according to the CSU Global Writing Center (Links to an external site.).
  • Cite a minimum of three sources to support your responses, two of which should be current academic, peer-reviewed, scholarly sources. Note: Current research in this class means the most recent five-year period. Although research older than five years may be used, it will not count toward the assignment requirement. The CSU Global Library is a great place to find these resources. Additionally, in the Module 1 lecture material, you were reminded of what constitutes academic, peer-reviewed, scholarly sources and how to find them in the CSU Global Library.
  • Demonstrate thoughtful consideration of the ideas and concepts that are presented in the course, and provide new thoughts and insights related directly to this topic.

Refer to the Critical Thinking Assignment grading rubric below for more information on assignment expectations and grading.

References

Mulcahy, R. (2003). Risk management: Tricks of the trade for project managers: A course in a book. Minneapolis, MN: RMC Pub.

Project Management Institute. (2017). A guide to the project management body of knowledge: (PMBOK® guide) (6th ed.). Newtown Square, PA, USA: Project Management Institute.

Dot Image
Getsolution Posted By :
Questions: 15503 Tutorials: 15502
Tutorials for this Question

Colorado PJM410 Module 2 Risk Breakdown Structure for a Foodbank

Tutorial # 00650310
Posted On: 12/24/2023 09:38 PM
Feedback Score: Not rated yet!
Purchased By: 2
Getsolution
Posted By:
Questions:
15503
Tutorials:
15502
Report this Tutorial as Inappropriate
Tutorial Preview
The solution of Colorado PJM410 Module 2 Risk Breakdown Structure for a Foodbank...
Attachments
Colorado_PJM410_Module_2_Risk_Breakdown_Structure_for_a_Foodbank.ZIP (18.96 KB)

Great! We have found the solution of this question!

Related Questions
Management Discussion - In Chapters 16 & 17 we must
National University Management Discussion In Chapters 16 & 17 we must broaden our bandwidth and understand our roles. What roles are included in Table 17.1 and how may we utilize them to gain t …
Management - Conflict Resolution, Identify a company of your choice 
National University Management Question Conflict Resolution   This assignment will guide you through a difficult topic -- conflict resolution.  You will apply what you've learned t …
Industrial Hazardous and Waste Management
Industrial Hazardous and Waste Management Do you use any of the treatment technologies discussed in this unit at home or work? Please discuss. If you don't use any at home or work, do an intern …
Industrial and Hazardous Waste Management
Industrial and Hazardous Waste Management This unit focuses on management principles related to industrial and hazardous wastes. Environmental managers face pressures to satisfy corporate financial …
Leadership Essay - Choose any two leaders who you consider
 South University Leadership Essay put well-known personalities and  yourself under the microscope to learn what makes you and the  individuals you select not only leaders but also w …
Unit 2 Chicago versus United States Demographic Profile Analysis
Unit 2 Chicago versus United States Demographic Profile Analysis Presentation For this assignment, you will need to become familiar with specialized business intelligence (BI) software, then downlo …
Management Unit 2 Chi Square and Hypothesis Testing Analysis Essay
NA Management Unit 2 Chi Square and Hypothesis Testing Analysis Essay Based upon the input from Units 1 and 2, you have just received your next assignment that will contribute to your next decision …
Management Practical Problem on Technology Consultant
WU Management Practical Problem on Technology Consultant Questions Question 1 Have you observed a practical problem on the job(Technology consultant) that you learned about in a MBA program cour …
MGMT Unit 5 Big D Incorporated Long Term Objectives
NA MGMT Unit 5 Big D Incorporated Long Term Objectives and Outcomes HW Next, download the file Sample Data. Prepare a chart similar to the one in the downloaded file to indicate whether the co …
Applying Valuation Technique in Personal Investment Strategy Discussion
CGTC Applying Valuation Technique in Personal Investment Strategy Discussion 1.Go to www.cnbc.com and explore the video tab by using several different key terms such as stock pricing …
Recent Questions
Walden HLTH6475 Complete Course Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 1 Discussion INDIVIDUAL RESPONSIBILITY VERSUS VICTIM BLAMING IN HEALTH PROMOTION Part of what makes a discussion a discussion and not a lectur …
Walden HLTH6475 All Quizzes Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 1 Quiz Question 1 Which factors have been found to influence behavior? Socioeconomic Status Skills Culture Attitude Gender A …
Walden HLTH6475 Module 6 Quiz Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 6 Quiz Question 1 Which method allows study participants to tell their stories?  Observations In-depth individual interview &nbs …
Walden HLTH6475 Module 5 Quiz Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 5 Quiz Question 1 What alternative term has been suggested recently for hard-to-reach? Marginalized Inaccessible Hard to access Ha …
Walden HLTH6475 Module 4 Quiz Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 4 Quiz Question 1 Outreach workers from the CeaseFire program spent a total of 500 combined hours with program participants during the first y …
Walden HLTH6475 Module 3 Quiz Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 3 Quiz Question 1 Which of the following is the construct of the Theory of Reasoned Action that explains behavior based on what we think other …
Walden HLTH6475 Module 2 Quiz Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 2 Quiz Question 1 If the program is aimed at a true population, the term is called ______________. Intended population Intended audience …
Walden HLTH6475 All Assignments Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 2 Assignment LANNING MODELS ARTICLE REVIEW The published literature is rich with examples of health promotion programs that have utilized the …
Walden HLTH6475 Module 6 Assignment Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 6 Assignment EVALUATION PLAN Once the program has been designed, it is time to consider how the program will be evaluated. To design an evalu …
Walden HLTH6475 Module 5 Assignment Latest 2024
HLTH6475 Prgm Plan, Implement & Eval Module 5 Assignment  DEVELOPING EVALUATION QUESTIONS Evaluation takes place at various points within a program's life cycle. It requires di …